Find number abc
[7492] Find number abc - If 1a377 + 3a4c2 = ab839 find number abc. Multiple solutions may exist. - #brainteasers #math - Correct Answers: 2
BRAIN TEASERS
enter your answer and press button OK

Find number abc

If 1a377 + 3a4c2 = ab839 find number abc. Multiple solutions may exist.
Correct answers: 2
#brainteasers #math
Register with your Google Account and start collecting points.
Check your ranking on list.

Philip was enjoying the second...

Philip was enjoying the second week of a two-week vacation the same way he had enjoyed the first week: by doing as little as possible.
He ignored his wife Paula's not-so-subtle hints about completing certain jobs around the house, but Philip didn't realize how much this bothered her until the clothes dryer refused to work, the iron shorted and the sewing machine motor burned out in the middle of a seam. The final straw came when she plugged in the vacuum cleaner and nothing happened.
Paula looked so stricken that he had to offer some consolation.
"That's OK, darling," Philip said. "You still have me."
Paula looked up at him with tears in her eyes. "Yes, Philip," she wailed, "but you don't work either."
Jokes of the day - Daily updated jokes. New jokes every day.
Follow Brain Teasers on social networks

Brain Teasers

puzzles, riddles, mathematical problems, mastermind, cinemania...

Coal pipeline completed

In 1956, construction was completed on the first U.S. commercial coal pipeline. This coal slurry pipeline ran 108 miles from a coal mine (Georgetown Preparation Plant of the Hanna Coal Company, near Cadiz, Ohio) to a power station (Cleveland Illuminating Company, in Eastlake, Ohio). The 10¾- in diam. pipeline could transport over a million tons of coal per year. Mixed with an equal amount of water, it delivered 150 tons of coal per hour. It was placed in operation on 4 Jun 1957. After processing to remove the water, the coal slurry was ready for burning as fuel for the power plant. Slurry pipelines now exist transporting over twenty types of minerals, including iron-ore concentrate, copper ore, phosphate rock concentrate and mineral sands. Pipeline transportation costs less than by railroad.«
This site uses cookies to store information on your computer. Some are essential to help the site properly. Others give us insight into how the site is used and help us to optimize the user experience. See our privacy policy.