Find number abc
[8240] Find number abc - If b1435 - 1ca1b = 4ab19 find number abc. Multiple solutions may exist. - #brainteasers #math - Correct Answers: 0
BRAIN TEASERS
enter your answer and press button OK

Find number abc

If b1435 - 1ca1b = 4ab19 find number abc. Multiple solutions may exist.
Correct answers: 0
#brainteasers #math
Register with your Google Account and start collecting points.
Check your ranking on list.

Midweek Mirth: A Collection of Short Jokes to Propel You to Friday

Did you hear about the terrible sinking of the cargo ship which was carrying shoes? Thousands of soles were lost to the sea that day.

I've found something my wife's bum doesn't look big in... The distance!

My wife says the salad I make tends to be a bit on the "dry" side. It's definitely something that needs addressing.

I went on a date with a girl who said she loved animals.
I said, "I work with animals every day."
She said, "That's so sweet. What do you do?"
I replied, "I'm a butcher!"

Scientists got bored after watching the Earth turn after 24 hours…
So they called it a day!

What’s the difference between a camera and a sock?
A camera takes photos, and a sock takes five toes.

Whats the best gift to give someone? A broken Drum. Nobody can beat it.

Jokes of the day - Daily updated jokes. New jokes every day.
Follow Brain Teasers on social networks

Brain Teasers

puzzles, riddles, mathematical problems, mastermind, cinemania...

Niagara rail bridge

In 1883, the international cantilever railway bridge at Niagara Falls was opened with a ceremony before a gathered crowd estimated at more than 10,000 persons. Atop each of two steel towers, two cantilever arms were built, one reaching the shore while the other reached over the gorge, then an ordinary truss bridged the gap between the cantilevers. The bridge span was 495-ft, carrying a double track railway 240-ft above the Niagara River, with weight capacity for two trains. Construction took from 15 Apr 1883 to 1 Dec 1883. This Michigan Central Railway Bridge remained in operation for more than 40 years until replaced by the present stronger steel arch bridge to carry heavier modern trains.«
This site uses cookies to store information on your computer. Some are essential to help the site properly. Others give us insight into how the site is used and help us to optimize the user experience. See our privacy policy.