Calculate the number 840
[7316] Calculate the number 840 - NUMBERMANIA: Calculate the number 840 using numbers [8, 6, 8, 5, 99, 164] and basic arithmetic operations (+, -, *, /). Each of the numbers can be used only once. - #brainteasers #math #numbermania - Correct Answers: 2
BRAIN TEASERS
enter your answer and press button OK

Calculate the number 840

NUMBERMANIA: Calculate the number 840 using numbers [8, 6, 8, 5, 99, 164] and basic arithmetic operations (+, -, *, /). Each of the numbers can be used only once.
Correct answers: 2
#brainteasers #math #numbermania
Register with your Google Account and start collecting points.
Check your ranking on list.

Bubba and Junior were standing...

Bubba and Junior were standing at the base of a flagpole, looking up.
A woman walked by and asked what they were doing. "We're supposed to find the height of the flagpole," said Bubba, "but we don't have a ladder."
The woman took a wrench from her purse, loosened a few bolts, and laid the pole down. Then she took a tape measure from her pocket, took a measurement, announced, "Eighteen feet, six inches," and walked away.
Junior shook his head and laughed. "Ain't that just like a dumb blonde! We ask for the height, and she gives us the length!"
Jokes of the day - Daily updated jokes. New jokes every day.
Follow Brain Teasers on social networks

Brain Teasers

puzzles, riddles, mathematical problems, mastermind, cinemania...

Niagara rail bridge

In 1883, the international cantilever railway bridge at Niagara Falls was opened with a ceremony before a gathered crowd estimated at more than 10,000 persons. Atop each of two steel towers, two cantilever arms were built, one reaching the shore while the other reached over the gorge, then an ordinary truss bridged the gap between the cantilevers. The bridge span was 495-ft, carrying a double track railway 240-ft above the Niagara River, with weight capacity for two trains. Construction took from 15 Apr 1883 to 1 Dec 1883. This Michigan Central Railway Bridge remained in operation for more than 40 years until replaced by the present stronger steel arch bridge to carry heavier modern trains.«
This site uses cookies to store information on your computer. Some are essential to help the site properly. Others give us insight into how the site is used and help us to optimize the user experience. See our privacy policy.