Calculate the number 3127
[7958] Calculate the number 3127 - NUMBERMANIA: Calculate the number 3127 using numbers [8, 4, 3, 9, 94, 579] and basic arithmetic operations (+, -, *, /). Each of the numbers can be used only once. - #brainteasers #math #numbermania - Correct Answers: 0
BRAIN TEASERS
enter your answer and press button OK

Calculate the number 3127

NUMBERMANIA: Calculate the number 3127 using numbers [8, 4, 3, 9, 94, 579] and basic arithmetic operations (+, -, *, /). Each of the numbers can be used only once.
Correct answers: 0
#brainteasers #math #numbermania
Register with your Google Account and start collecting points.
Check your ranking on list.

Late for Work

Tom had this problem of getting up late in the morning and was always late for work. His boss was mad at him and threatened to fire him if he didn't do something about it. So Tom went to his doctor who gave him a pill and told him to take it before he went to bed.
Tom slept well and in fact beat the alarm in the morning. He had a leisurely breakfast and drove cheerfully to work. "Boss," he said, "The pill actually worked!"
"That's all fine" said the boss. "But where were you yesterday?"

Jokes of the day - Daily updated jokes. New jokes every day.
Follow Brain Teasers on social networks

Brain Teasers

puzzles, riddles, mathematical problems, mastermind, cinemania...

Coal pipeline completed

In 1956, construction was completed on the first U.S. commercial coal pipeline. This coal slurry pipeline ran 108 miles from a coal mine (Georgetown Preparation Plant of the Hanna Coal Company, near Cadiz, Ohio) to a power station (Cleveland Illuminating Company, in Eastlake, Ohio). The 10¾- in diam. pipeline could transport over a million tons of coal per year. Mixed with an equal amount of water, it delivered 150 tons of coal per hour. It was placed in operation on 4 Jun 1957. After processing to remove the water, the coal slurry was ready for burning as fuel for the power plant. Slurry pipelines now exist transporting over twenty types of minerals, including iron-ore concentrate, copper ore, phosphate rock concentrate and mineral sands. Pipeline transportation costs less than by railroad.«
This site uses cookies to store information on your computer. Some are essential to help the site properly. Others give us insight into how the site is used and help us to optimize the user experience. See our privacy policy.