Calculate the number 5696
[7462] Calculate the number 5696 - NUMBERMANIA: Calculate the number 5696 using numbers [5, 7, 9, 9, 23, 822] and basic arithmetic operations (+, -, *, /). Each of the numbers can be used only once. - #brainteasers #math #numbermania - Correct Answers: 2
BRAIN TEASERS
enter your answer and press button OK

Calculate the number 5696

NUMBERMANIA: Calculate the number 5696 using numbers [5, 7, 9, 9, 23, 822] and basic arithmetic operations (+, -, *, /). Each of the numbers can be used only once.
Correct answers: 2
#brainteasers #math #numbermania
Register with your Google Account and start collecting points.
Check your ranking on list.

An Inscription Problem

According to the Knight-Ridder News Service, the inscription on the metal bands used by the U.S. Department of the Interior to tag migratory birds has been changed. The bands used to bear the address of the Washington Biological Survey, abbreviated, "Wash. Biol. Surv." until the agency received the following letter from an Arkansas camper:
"Dear Sirs: While camping last week I shot one of your birds. I think it was a crow. I followed the cooking instructions on the leg tag and I want to tell you it was horrible."
Jokes of the day - Daily updated jokes. New jokes every day.
Follow Brain Teasers on social networks

Brain Teasers

puzzles, riddles, mathematical problems, mastermind, cinemania...

Alfred Brandt

Born 3 Sep 1846; died 29 Nov 1899 at age 53.German civil engineer whose major achievement was enabling construction of the 12.5 mile (20-km) Simplon Tunnel, a major tunnel through the Alps between Italy and Switzerland. As a young engineer working onboring the St. Gotthard Tunnel between Italy and Switzerland, he learned about the difficulties involved, and the use of pneumatic drills and blasting. A hydraulic drill of his own design was used to drive theArlberg Tunnel between Austria and Switzerland. To dig the Simplon Tunnel, he innovated by driving two separate tunnels 55-ft (17-m) apart, connected by crosshatches to provide for ventilation, temperature control and a circuit for debris-removal trains. He died early in the project, from the strain of overworking himself.«[Image: Simplon Tunnel during construction, model]
This site uses cookies to store information on your computer. Some are essential to help the site properly. Others give us insight into how the site is used and help us to optimize the user experience. See our privacy policy.